Work Management

Plan, execute, evidence and close maintenance work — work orders, their tasks, assignments and labour time; the materials and tools the work needs; safety documents and isolations; and the completion trail: removed components, evidence, tests, return to service, verification and closeout. Templates turn routine maintenance into consistent work orders.

Its central question:

For each piece of work on an asset, what has to be done, who is doing it, what does it need (parts, tools, isolations) — is anything blocking it — and is there evidence that it was done properly before the asset went back into service?

It is a member of the R9 Work & Supply network: it owns work orders and material requirements, tells the network when material is needed, and hears back from Inventory whether stock was reserved or is unavailable — without anyone re-keying data between the two applications.

The work spine

Maintenance Template → Work Order → Work Task / Assignment / Time Entry → Material & Tool Requirements → Safety Documents / Isolation → Removed Component → Evidence → Test Result → Return to Service → Verification → Closeout, with a Work Status History trail and Work Dependencies (material, access, isolation, other work) that can hold the order.

The documents

Page What's in it
00 — Overview What the app is, the domain, the 21 models by area, the demo scenario
01 — Quick Reference Statuses, numbering, references to other apps, everyday tasks
02 — System Diagram The work spine and the material flow as diagrams, plus the interactive viewer
03 — Integration What it publishes, consumes, accepts and answers on the network, and what is implemented

Port 5087 · application code work_management · network domain work.